1 / 8
I-302
Wall-hung HPL vanity unit with countertop washbasin
Wall-hung compact HPL bathroom unit, with a countertop washbasin and storage configured to order.
You don't need to know all the technical details — we'll work them out together.
Tested by maxCL Internal maxCL test on a prototype of a wall-hung assembly: a total load of approximately 250 kg over a span of approximately 1.5 m, with a…Description
A complete assembly that combines the washbasin top with drawers, doors or niches. The fronts can continue the same decor or create a contrast, and the geometry adapts to the services and the circulation in the bathroom.
Technical details
CNC-machined HPL components, with hardware chosen for a damp environment. Internal division, stiffening, runners and cut-outs are set according to dimensions and loads. Edges and service openings are finished and sealed according to the configuration.
Tested by maxCL
Internal maxCL test on a prototype of a wall-hung assembly: a total load of approximately 250 kg over a span of approximately 1.5 m, with an observed deflection of approximately 1 mm.
The results apply only to the prototype and support tested; this is not a certification for other configurations. The support is sized for each project.
Sizes and options
One or two washbasins; drawers, doors or niches; surface-mounted handles, profile or handleless opening; optional ambient lighting.
Decors and finishes
Plain colour, wood, stone or concrete decors, within the available HPL collection. Core colour, texture, thickness and decor orientation are confirmed when we prepare the quote.
Suggested decors — tap a swatch to see it on a full panel
XCL RT 26
Lyon Walnut
XCL RT 27
North Walnut
XCL RC 459
Lancelot Oak
XCL RC 618
White
XCL RC 638
Pinara
XCL RC 641
Canyon Apple
XCL RC 645
Columbia Ash
XCL RC 658
Tabo Slate
XCL RC 684
Stromboli
XCL RC 804
Advika
XCL RC 905
Noce Versailles
XCL RC 955
Atlantic Coast
XCL RT 1520
Manhattan
XCL RT 1522
Manhattan
Installation
Wall-hung on a load-bearing wall or a prepared structure. The position of the supply and waste connections must be confirmed before production; the connections remain accessible for service.

















